MSD Waterway Protection Tunnel
- Project Owner: MSD
- Contractor: Shea-Traylor Joint Venture
- Process Engineer: HDR Engineering, Inc.
- Completion Date: 2020
- Location: Louisville, KY
- Cost: $200 million
Special Inspection services on the final structural lining for the shafts and tail tunnel located at 12th and Rowan Street, downtown Louisville, Kentucky.